ADVERTISEMENT

Grid collapse: TCN restores power to 90% substations

ADVERTISEMENT

Grid collapse: TCN restores power to 90% substations

The Transmission Company of Nigeria has said 90 per cent of its substations have received bulk power supply following efforts to recover the grid which suffered another collapse on Tuesday.

Related posts

ADVERTISEMENT

It said the ongoing restoration of the national grid which collapsed for the sixth time this year is ongoing and almost completed.

ADVERTISEMENT

The Public Affairs General Manager of TCN, Ndidi Mbah said in a press statement that it has restored supply to Abuja.

On Monday, the grid collapsed at about 6:18 p.m., plunging many into darkness.

Checks by our correspondent confirmed that power generation dropped from 3.87 gigawatts at 5 p.m. to 3.56GW at 6 pm., and then to 0.00GW by 7 pm and 8 pm.

Reacting, electricity consumers in the Federal Capital Territory decried the incessant grid collapses, describing them as an embarrassment to the country.

But the transmission company in a reassuring message said the problem would be resolved soon.

The statement read, ā€œThe Transmission Company of Nigeria hereby states that the national grid experienced a partial disturbance, on Monday, 14th October 2024 at about 6:48 pm and notes that efforts to fully recover the grid are still ongoing.

ā€œAlthough the recovery of the grid commenced immediately, with Azura power station providing the blackstart, grid recovery reached advanced stages at about 10.24 am, today when it encountered a challenge that caused a slight setback in the recovery process.

ā€œThe slight setback notwithstanding, TCN continued with the grid recovery process, which has reached an advanced stage, ensuring bulk power availability to about 90 per cent of its substations nationwide.

The statement added that supply has been restored to the Abuja axis and other major distribution load centres nationwide.

ā€œSupply has been restored to the Abuja axis and other major distribution load centers nationwide.

ā€œThe partial disturbance did not affect the Ibom Gas generating station which was islanded from the grid yesterday and continued to supply areas in the South Southern part of the country such as Eket, Ekim, Uyo, and Itu 132kV transmission Substations during the period.

ā€œInvestigation into the cause of the incident will be carried out as soon as the grid is fully restored.ā€

 

Share this post

Facebook
WhatsApp
Twitter
LinkedIn
Telegram
Email
Print

Leave a Reply

Your email address will not be published. Required fields are marked *

Kindly accept our Terms & Conditions and Privacy Policy .

Related Posts

Welcome Back!

Login to your account below

Retrieve your password

Please enter your username or email address to reset your password.